  "schema": "wecairs-assessment-v2",
  "project": {
    "name": "PILOT-01 \u00b7 Google \u2014 The Dalles \u00b7 Public Evidence Review",
    "location": "The Dalles, Oregon, USA",
    "researcher": "WECAIRS \u2014 preliminary desk review",
    "date": "2026-11-25"
  },
  "indicators": {
    "P1-01": {
      "status": "in-progress",
      "notes": "Annual facility electricity demand (MWh) not yet established from primary site-specific records. Linked source IDs: GTD-S06, GTD-S08. Not independently audited; no performance conclusion.",
      "rating": ""
    },
    "P1-02": {
      "status": "in-progress",
      "notes": "Interconnection, capacity and local grid cost/reliability evidence not yet established. Linked source IDs: GTD-S04, GTD-S06. Not independently audited; no performance conclusion.",
      "rating": ""
    },
    "P1-03": {
      "status": "in-progress",
      "notes": "Oregon-wide 2023 hourly CFE figure 84% is available; site-level and 2025 boundaries remain open. Linked source IDs: GTD-S02. Not independently audited; no performance conclusion.",
      "rating": ""
    },
    "P1-04": {
      "status": "in-progress",
      "notes": "Operator reports an Oregon 2023 average PUE of 1.09 and 6\u201310% overhead energy at its The Dalles sites in Q4 2025; methods and independent verification pending. Linked source IDs: GTD-S02, GTD-S03. Not independently audited; no performance conclusion.",
      "rating": ""
    },
    "P1-05": {
      "status": "in-progress",
      "notes": "Community energy-rate impact and consultation evidence not established. Linked source IDs: GTD-S07. Not independently audited; no performance conclusion.",
      "rating": ""
    },
    "P2-01": {
      "status": "in-progress",
      "notes": "OPB reports city-supplied figures of 383.9M gallons (2023) and 434.4M gallons (2024). Google reports 469M gallons consumed in 2025. No city-metered 2025 figure was found, so the two cannot yet be compared. Linked source IDs: GTD-S01, GTD-S03, GTD-S08. Not independently audited; no performance conclusion.",
      "rating": ""
    },
    "P2-02": {
      "status": "in-progress",
      "notes": "Different reported water consumption figures and scopes; need withdrawal/consumption/return flow definitions and metered source. Linked source IDs: GTD-S01, GTD-S02, GTD-S03. Not independently audited; no performance conclusion.",
      "rating": ""
    },
    "P2-03": {
      "status": "in-progress",
      "notes": "Residents raised Google\u2019s water use at a September 2026 council meeting during drought restrictions (local reporting). Drought, water-rights and watershed effects need municipal records. Linked source IDs: GTD-S05, GTD-S09. Not independently audited; no performance conclusion.",
      "rating": ""
    },
    "P2-04": {
      "status": "in-progress",
      "notes": "Operator documents water cooling and ASR infrastructure; independent operation and savings evidence needed. Linked source IDs: GTD-S02, GTD-S03, GTD-S05. Not independently audited; no performance conclusion.",
      "rating": ""
    },
    "P2-05": {
      "status": "in-progress",
      "notes": "City FAQ page, water agreements and residents\u2019 questions identified; how well consultation works is not yet assessed. Linked source IDs: GTD-S01, GTD-S05, GTD-S07, GTD-S09. Not independently audited; no performance conclusion.",
      "rating": ""
    }
  },
  "evidence": [
    {
      "title": "GTD-S01 \u00b7 City-supplied water records reported by Oregon Public Broadcasting",
      "indicator": "P2-01",
      "url": "https://www.opb.org/article/2026/01/23/the-dalles-mayor-data-center-google/",
      "date": "2026-01-23",
      "confidence": "unassessed",
      "notes": "2023 383.9M gallons; 2024 434.4M gallons; OPB quotes the city\u2019s retired public works director describing Google as the city\u2019s largest water customer. The underlying city spreadsheet was not retrieved. Related indicator IDs: P2-01, P2-02, P2-05"
    },
    {
      "title": "GTD-S02 \u00b7 Google / Deloitte 2024 Oregon Data Center Impact Study",
      "indicator": "P1-03",
      "url": "https://www.gstatic.com/marketing-cms/4b/74/12ce25984985ae4e12071523a4c2/2024-impact-study-oregon.pdf",
      "date": "",
      "confidence": "unassessed",
      "notes": "Oregon data center averages: 2023 PUE 1.09, hourly CFE 84%; 2023 statewide water consumption 302.4M gallons; Google says $28.5M local water/sewer investment. Statewide and differing measurement boundaries must not be conflated with city meter figures. Related indicator IDs: P1-03, P1-04, P2-02, P2-04"
    },
    {
      "title": "GTD-S03 \u00b7 Google 2026 Environmental Report",
      "indicator": "P1-04",
      "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
      "date": "",
      "confidence": "unassessed",
      "notes": "Google reports consuming 469M gallons of water in The Dalles in 2025, and says its The Dalles sites needed 6% to 10% additional energy for overhead in Q4 2025 (roughly a PUE of 1.06 to 1.10). Operator figures need comparing with city-metered data on the same boundaries. Related indicator IDs: P1-04, P2-01, P2-02, P2-04"
    },
    {
      "title": "GTD-S04 \u00b7 Oregon Department of Energy 2024 Biennial Energy Report",
      "indicator": "P1-02",
      "url": "https://www.oregon.gov/energy/Data-and-Reports/Documents/2024-Biennial-Energy-Report.pdf",
      "date": "",
      "confidence": "unassessed",
      "notes": "State report says electricity demand is rising partly because of new industrial loads such as data centers. It does not discuss The Dalles or Google\u2019s water use. Related indicator IDs: P1-02"
    },
    {
      "title": "GTD-S05 \u00b7 Google presentation on The Dalles water infrastructure (hosted by the Oregon Department of Energy)",
      "indicator": "P2-03",
      "url": "https://www.oregon.gov/energy/Get-Involved/Documents/2026-03-27-Shin-Google-The-Dalles.pdf",
      "date": "2026-03-27",
      "confidence": "unassessed",
      "notes": "Presentation describes aquifer storage and recovery, two reservoirs, pump stations and wells in The Dalles, and a $28M Google infrastructure investment. It describes design, not measured results. Related indicator IDs: P2-03, P2-04, P2-05"
    },
    {
      "title": "GTD-S06 \u00b7 Oregon Public Broadcasting: Data center power demand in Oregon",
      "indicator": "P1-01",
      "url": "https://www.opb.org/article/2026/09/17/oregon-data-centers-consume-quarter-state-power-report/",
      "date": "2026-09-17",
      "confidence": "unassessed",
      "notes": "Statewide data center power use estimated at about 23% of Oregon retail electricity sales in 2025. Not a The Dalles or Google facility electricity value. Related indicator IDs: P1-01, P1-02"
    },
    {
      "title": "GTD-S07 \u00b7 Columbia Gorge News: City data center FAQ launch",
      "indicator": "P2-05",
      "url": "https://www.columbiagorgenews.com/news/the-dalles-launches-data-center-faq-page/article_0ea92979-2dce-4345-b465-e73a06dff3ac.html",
      "date": "2026-11-17",
      "confidence": "unassessed",
      "notes": "City launched FAQ and supporting document portal for Google data centers, water agreements and taxes. Primary records should be retrieved and checked. Related indicator IDs: P2-05, P1-05"
    },
    {
      "title": "GTD-S08 \u00b7 Google The Dalles data center location page",
      "indicator": "P1-01",
      "url": "https://www.datacenters.google/locations/oregon/",
      "date": "",
      "confidence": "unassessed",
      "notes": "Confirms facility presence and offers operator contact channel. Related indicator IDs: P1-01, P2-01"
    },
    {
      "title": "GTD-S09 \u00b7 Local report of drought-restriction public discussion",
      "indicator": "P2-03",
      "url": "https://columbiacommunityconnection.com/the-dalles/drought-restrictions-put-google-water-use-back-in-spotlight-at-the-dalles-city-council",
      "date": "",
      "confidence": "unassessed",
      "notes": "Reports that residents asked the city council on 14 September 2026 about Google\u2019s water use during drought restrictions. A resident\u2019s percentage figures were not independently verified. Related indicator IDs: P2-03, P2-05"
    }
  ],
  "summary": "PRELIMINARY DESK REVIEW \u2014 Nine public-source entries mapped across P1/P2. All ten indicators in progress, none rated or verified. City-metered water figures and operator-reported water figures may use different boundaries; reconcile before scoring. This is not certification."
}