Project identification
Google operates data centers in The Dalles, Oregon, according to its data center location page. Facility boundaries, dates and project specifics require verification against primary records before publication.
WECAIRSTechnology × Stewardship
WECAIRS / Pilot research
Provisional research brief reporting what public records show · Not a rating, audit or certification.
Google operates data centers in The Dalles, Oregon, according to its data center location page. Facility boundaries, dates and project specifics require verification against primary records before publication.
Research queue: verify electricity demand disclosures, utility/grid documents, power infrastructure, local system effects and operator statements. P1 methodology.
Research queue: verify water sources, cooling design, permitted and reported demand, local water context and relevant public records. P2 methodology.
Research queue: identify public hearings, local planning and permitting records, community concerns and responses, and disclosure practices.
The first public evidence register is below, with a link for every source. Nothing on this page is a finding about Google’s performance.
Numerical score: not published. Certification: none. Any score WECAIRS publishes later will be a research-stage estimate from public data, not a rating or certification of the company. Conclusions remain pending source review, workbook verification and technical review.
If you represent Google, or hold a public record that corrects anything here, write to info@wecairs.org. We review every correction and note changes on this page. Please do not send confidential information.
PILOT-01 / RESEARCH UPDATE · 25 NOVEMBER 2026
We identified nine public-source records relevant to the ten proposed P1 and P2 indicators. This is an initial desk review, not an audit or performance rating. Source dates, scopes and measurement boundaries vary.
434.4 million gallons reported by OPB from City of The Dalles records for Google's 2024 water use. Verify against the original municipal dataset before scoring.
1.09 PUE and 84% hourly carbon-free energy reported for Google's Oregon data centers by its commissioned impact study. These are not site-specific The Dalles electricity totals.
| Indicator | Preliminary research note | Sources |
|---|---|---|
| P1-01 | Annual facility electricity demand (MWh) not yet established from primary site-specific records. | GTD-S06, GTD-S08 |
| P1-02 | Interconnection, capacity and local grid cost/reliability evidence not yet established. | GTD-S04, GTD-S06 |
| P1-03 | Oregon-wide 2023 hourly CFE figure 84% is available; site-level and 2025 boundaries remain open. | GTD-S02 |
| P1-04 | Operator reports an Oregon 2023 average PUE of 1.09 and 6–10% overhead energy at its The Dalles sites in Q4 2025; methods and independent verification pending. | GTD-S02, GTD-S03 |
| P1-05 | Community energy-rate impact and consultation evidence not established. | GTD-S07 |
| P2-01 | OPB reports city-supplied figures of 383.9M gallons (2023) and 434.4M gallons (2024). Google reports 469M gallons consumed in 2025. No city-metered 2025 figure was found, so the two cannot yet be compared. | GTD-S01, GTD-S03, GTD-S08 |
| P2-02 | Different reported water consumption figures and scopes; need withdrawal/consumption/return flow definitions and metered source. | GTD-S01, GTD-S02, GTD-S03 |
| P2-03 | Residents raised Google’s water use at a September 2026 council meeting during drought restrictions (local reporting). Drought, water-rights and watershed effects need municipal records. | GTD-S05, GTD-S09 |
| P2-04 | Operator documents water cooling and ASR infrastructure; independent operation and savings evidence needed. | GTD-S02, GTD-S03, GTD-S05 |
| P2-05 | City FAQ page, water agreements and residents’ questions identified; how well consultation works is not yet assessed. | GTD-S01, GTD-S05, GTD-S07, GTD-S09 |
| ID | Source | Extract / limitation | Mapped indicators |
|---|---|---|---|
| GTD-S01 | City-supplied water records reported by Oregon Public BroadcastingIndependent reporting based on municipal records | 2023 383.9M gallons; 2024 434.4M gallons; OPB quotes the city’s retired public works director describing Google as the city’s largest water customer. The underlying city spreadsheet was not retrieved. | P2-01, P2-02, P2-05 |
| GTD-S02 | Google / Deloitte 2024 Oregon Data Center Impact StudyOperator-sponsored study | Oregon data center averages: 2023 PUE 1.09, hourly CFE 84%; 2023 statewide water consumption 302.4M gallons; Google says $28.5M local water/sewer investment. Statewide and differing measurement boundaries must not be conflated with city meter figures. | P1-03, P1-04, P2-02, P2-04 |
| GTD-S03 | Google 2026 Environmental ReportOperator self-report | Google reports consuming 469M gallons of water in The Dalles in 2025, and says its The Dalles sites needed 6% to 10% additional energy for overhead in Q4 2025 (roughly a PUE of 1.06 to 1.10). Operator figures need comparing with city-metered data on the same boundaries. | P1-04, P2-01, P2-02, P2-04 |
| GTD-S04 | Oregon Department of Energy 2024 Biennial Energy ReportState government report | State report says electricity demand is rising partly because of new industrial loads such as data centers. It does not discuss The Dalles or Google’s water use. | P1-02 |
| GTD-S05 | Google presentation on The Dalles water infrastructure (hosted by the Oregon Department of Energy)Operator presentation on a state website | Presentation describes aquifer storage and recovery, two reservoirs, pump stations and wells in The Dalles, and a $28M Google infrastructure investment. It describes design, not measured results. | P2-03, P2-04, P2-05 |
| GTD-S06 | Oregon Public Broadcasting: Data center power demand in OregonIndependent reporting | Statewide data center power use estimated at about 23% of Oregon retail electricity sales in 2025. Not a The Dalles or Google facility electricity value. | P1-01, P1-02 |
| GTD-S07 | Columbia Gorge News: City data center FAQ launchLocal reporting about municipal disclosure | City launched FAQ and supporting document portal for Google data centers, water agreements and taxes. Primary records should be retrieved and checked. | P2-05, P1-05 |
| GTD-S08 | Google The Dalles data center location pageOperator page | Confirms facility presence and offers operator contact channel. | P1-01, P2-01 |
| GTD-S09 | Local report of drought-restriction public discussionLocal reporting | Reports that residents asked the city council on 14 September 2026 about Google’s water use during drought restrictions. A resident’s percentage figures were not independently verified. | P2-03, P2-05 |
Correction, 26 November 2026: an earlier version tied a 29% share of city water to the state energy report (GTD-S04). That figure came from a resident at a September 2026 council meeting (GTD-S09) and was not independently verified, so it has been removed from GTD-S04.
Obtain the city's original metered-water spreadsheet and data dictionary; reconcile Google-reported consumption with city metering; obtain site-specific annual MWh, grid agreements and demand projections; verify water rights, drought contingencies, discharge and aquifer-storage outcomes; seek operator and community responses.
Open assessment workspace → Download importable evidence JSON · Download source register
To load the evidence: open Assessment → Import JSON → select the downloaded public evidence JSON. This replaces the active local draft; export any existing work first.
Published by WECAIRS, a project of Morrison Washington LLC · Last updated · Working draft, v0.1. Read the research disclaimer.